Interim Certificate Report (ICR): the contractor has satisfactorily complete the stage of work as require: LotNo F190050; 2019
the work has been done according to specification
the work has been done according to specification
there was loose layers of soil at the collapsed section. information gathered reveal that there was
CONSTRUCTION OF 1NO. 4-MAN RANK AND FILE QUARTERS (STOREY TYPE) AT MOPOL BARRACKS KUJE JUNCTION, AIR
work completed to DPC Level. DpC cast. 15 % of the total contract sum reccommended
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore
The passage experienced a surge in popularity during the 1960s when Letraset used it on their dry-tr
a section of excavated septic tank collapsed
CONSTRUCTION OF 1NO. 4-MAN RANK AND FILE QUARTERS (STOREY TYPE) AT MOPOL BARRACKS KUJE JUNCTION, AIR