Land Acquisition Report (LDR): land for barracks: LotNo F180077; 2018
the community donated 1 acre of land for the barracks
the community donated 1 acre of land for the barracks
the dpo and his team visited the site
job satisfactorily completed
there was loose layers of soil at the collapsed section. information gathered reveal that there was
a section of excavated septic tank collapsed
contractor has satisfactorily completed this stage of work to specification
contractor has satisfactorily completed this stage of work to specification
contractor has satisfactorily completed this stage of work to specification
the youths came and demanded for matching ground. the contractor spoke to them and the left.
compaction, damp proof membrane and brc mesh installation