Contract Year: 2018
Completion Report (CPR): project completion: LotNo F180077; 2018
job satisfactorily completed
Investigation Report (IVR): cause of excavated septic tank /soak away collapse: LotNo F180077; 2018
there was loose layers of soil at the collapsed section. information gathered reveal that there was
Monthly Progress Report (PRG): Vivamus dapibus velit nec enim efficitur ullamcorper vitae sit amet purus. Maecenas dolor urna, hendrerit aliquam ligula id, maximus tincidunt metus.: LotNo F180183; 2018
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore
Incident Report (INR): INCIDENT REPORT IGP FLAGHOUSE: LotNo F180207; 2018
The passage experienced a surge in popularity during the 1960s when Letraset used it on their dry-tr
Incident Report (INR): collapse of excavated septic tank/soakaway: LotNo F180077; 2018
a section of excavated septic tank collapsed
Interim Certificate Report (ICR): INTERIM CERTIFICATE IGP FLAG HOUSE: LotNo F180207; 2018
The passage experienced a surge in popularity during the 1960s when Letraset used it on their dry-tr
Interim Certificate Report (ICR): foundation to dpc: LotNo F180077; 2018
contractor has satisfactorily completed this stage of work to specification
Interim Certificate Report (ICR): foundation to dpc: LotNo F180077; 2018
contractor has satisfactorily completed this stage of work to specification
Interim Certificate Report (ICR): foundation to dpc: LotNo F180077; 2018
contractor has satisfactorily completed this stage of work to specification