Monthly Progress Report (PRG): F-180003: 2018: REHABILITATION OF 1NO. ABUJA TYPE II POLICE STATION AT DUTSEN MA, KATSINA STATE.: LotNo F180003; 2018

work 100% completed.

Milestones are
Borehole Construction.
.
.
over fulfilment.

Recommendations: Contractor recommended for the next stage of payment.


Post has 6 Image Attachments

Post has 2 Non-Image Attachment(s) Links.
    1: VID_20190427_113216 {"filesize":10746985,"mime_type":"video\/mp4","length":11,"length_formatted":"0:11","width":1080,"height":1920,"fileformat":"mp4","dataformat":"quicktime","audio":{"dataformat":"mp4","codec":"ISO\/IEC 14496-3 AAC","sample_rate":44100,"channels":2,"bits_per_sample":16,"lossless":false,"channelmode":"stereo"},"created_timestamp":1556361136,"creation_date":"Sat-27-Apr-2019 10:32:16 +00:00"}
    2: VID_20190427_113216-1 {"filesize":10746985,"mime_type":"video\/mp4","length":11,"length_formatted":"0:11","width":1080,"height":1920,"fileformat":"mp4","dataformat":"quicktime","audio":{"dataformat":"mp4","codec":"ISO\/IEC 14496-3 AAC","sample_rate":44100,"channels":2,"bits_per_sample":16,"lossless":false,"channelmode":"stereo"},"created_timestamp":1556361136,"creation_date":"Sat-27-Apr-2019 10:32:16 +00:00"}




    Leave a Reply
    Top